the rybka difference
Energy-efficient, bright and low-carbon campus for 1,350 pupils.
Value: £32M
Client: North Lanarkshire Council
Architect: Archial Norr
The new Greenfaulds High School, built within the grounds of the existing school, provides educational accommodation for 1,350 pupils. The three storey new-build contains teaching spaces, an assembly hall, and dining and social areas as well as myriad sporting facilities.
The school benefits from a range of energy efficiency and sustainability measures including on-site biomass to meet the majority of the heating demand and optimisation of daylighting to reduce the need for artificial lighting.
Rybka’s design of the building services also included a dynamic ventilation system with heat recovery that supplies air based on the room occupancy and CO2 levels.
![greenfaulds1](https://rybka.co.uk/wp-content/uploads/2017/06/greenfaulds1-1920x800.jpg)
![greenfaulds2](https://rybka.co.uk/wp-content/uploads/2017/06/greenfaulds2-1200x750.jpg)
![greenfaulds3](https://rybka.co.uk/wp-content/uploads/2017/06/greenfaulds3-1200x750.jpg)
Find out what Rybka can do for you.
![st-andrew-tn](https://rybka.co.uk/wp-content/uploads/2017/06/st-andrew-tn-1200x900.jpg)
42 St Andrews Square, Edinburgh
![GroundFloor19](https://rybka.co.uk/wp-content/uploads/2017/06/GroundFloor19.jpg)